Bellingham Conservation Commission Splits on Blackstone Street Road Waiver, Advances Seven Home Filings

BELLINGHAM — June 10, 2026 — Bellingham Conservation Commission denied a key wetland buffer waiver for a Blackstone Street road improvement project and revoked an enforcement order against a local restaurant at its June 10 meeting. The commission voted 3-2 to deny Waiver Request 2 filed by Wall Street Development, which would have allowed a stormwater basin to be placed within the 25-foot no-disturb zone adjacent to bordering vegetated wetland; attorney Lou Petrozi indicated engineers would revise the basin design before the matter returns June 24. Three other waivers for the same project — covering alternatives analysis, vernal pool buffer alignment, and tree identification — were approved. The commission also revoked an enforcement order against the Flying Bridge restaurant at 455 Hartford Avenue after owner Michael Fabriano and representative Bruce Karen demonstrated that flour-and-water rinse water, not cooking oil, had caused mold buildup on a riverbank, and that all tub rinsing had been moved indoors. Separately, the commission opened and continued seven new single-family home Notice of Intent applications for Lots 77 through 83 in the Toll Northeast V Corporation Red Mill subdivision, and voted unanimously to issue two Certificates of Compliance for 225 Farm Street correcting a longstanding recording error.

Keep reading with a 14-day free trial

Subscribe to Norfolk County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Norfolk County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe